Estimating for Builders and Surveyors 2nd Edition by Ross Buchan, Eric Fleming, Fiona Grant – Ebook PDF Instant Download/Delivery: 9781136405075 ,1136405070
Full download Estimating for Builders and Surveyors 2nd Edition after payment
Product details:
ISBN 10: 1136405070
ISBN 13: 9781136405075
Author: Ross Buchan, Eric Fleming, Fiona Grant
Estimating for Builders and Surveyors 2nd Edition Table of contents:
1 Introduction
The UK construction industry
Introduction to estimating
The invitation to tender
The estimating method
Tender procedure
Negotiated tender
Selective tendering for design and build
2 The cost of labour
The all-in hourly rate
The Working Rules
Estimating the cost of labour
Entitlement to basic and additional rates of pay (WR1)
Work in difficult conditions (WR1 – Schedule 2)
Bonus (WR2)
Working hours (WR3)
Overtime (WR4)
Daily fare and travel allowance (WR5)
Rotary shift working (WR6)
Night work (WR7)
Continuous working (WR8)
Tide work (WR9)
Tunnel work (WR10)
Refuelling, servicing, maintenance and repairs (WR11)
Storage of tools (WR12)
Loss of clothing (WR13)
Transfer arrangements (WR14)
Subsistence allowance (WR15)
Periodic leave (WR16)
Guaranteed minimum weekly earnings (WR17)
Annual holidays (WR18)
Sick pay (WR20)
Benefit schemes (WR21)
Scaffolders (WR 26)
Employer’s Contributions for National Insurance
Employer’s liability insurance
Construction Industry Training Board levy
Redundancy funding
Supervision: foremen, chargehands, gangers
Bonus, incentive and productivity schemes
Excess overtime allowance
Practical estimating
3 Mechanical plant
Introduction
Purchase or hire?
Depreciation
Life of plant
Hours worked per annum
Repairs and renewals
Tracks and tyres
Inflation
Summary
4 Preliminaries SMM7 Section A
Introduction
Project particulars (A10)
Tender and contract documents (A11)
The site/existing buildings (A12)
Description of the works (A13)
The contract/sub-contract (A20)
Employer’s requirements
Dayworks (A55)
Collection of example costs
5 Excavation and filling SMM7 Section D2
Site preparation
Lifting turf for preservation
Excavation: general remarks
Hand excavation
Depth and throw
Soil conditions
Outputs
Machine excavation
Ground water
Services
Breaking out
Working space
Earthwork support
Disposal of water
Disposal of excavated material
Filling to excavations
Surface packing
Surface treatments
6 Concrete work SMM7 Sections E11, E20, E30, F31
In situ concrete
Materials
Weights and volumes
Shrinkage in concrete mix
Costing for shrinkage
Mixer costs
Labour costs
Reinforcement for in situ concrete
7 Brickwork and blockwork SMM7 Sections F10, F30
Introduction
Mortar
Bricks per wall area
Labour costs
Common brickwork
Brickwork sundries
Facing brickwork
Jointing and pointing
Special brickwork
Blockwork
8 Underpinning SMM7 Sections C30, D50
Introduction
Shoring (C30)
Underpinning (D50)
9 Roof coverings SMM7 Sections H60, H62, H63, H71
Slate roofing
Tile roofing
Clay plain roof tiles
Concrete roofing tiles
Lead sheet coverings and flashings
Fixing accessories for external leadwork
Copper clips
Nails
Screws
Solder
Underlay
Outputs
10 Asphalt work SMM7 Sections J20, J21, M11
Introduction
Plant
Materials
Labour
Wastage
Building-up rates
11 Woodwork carpentry: first fixings SMM7 Sections G20, K10, K31
Special requirements
Timber sizes and costs
Fastenings and adhesives
Labour constants
Examples of rates calculation
12 Woodwork joinery: second fixings and finishings SMM7 Sections K11, K20, L10, L20, L30, P20, P21
Introduction
13 Structural steelwork and metalwork SMM7 Sections G10, G12, Lll, L21, L31
Introduction
Isolated structural metal members (G12)
Metal windows/rooflights/screens/louvres (L11)
Metal stairs/walkways/balustrades (L31)
14 Plumbing installations SMM7 Sections R10, Rll, Y10r Yll, N13
Introduction
All-in rates for pipe
Joints
Special tools
Labour costs and outputs
Copper pipework and fittings
Soil, waste and ventilation piping
Rainwater goods
Plastic water supply piping
Sanitary fittings
Water tanks and cylinders
Central heating systems
Polybutylene hot and cold water piping and fittings
15 Linings, partitions and surface finishes SMM7 Sections K10, K31, K41, M10, M20, M30, M40
Plasterboard
Cement/sand screeds
Granolithic screeds
Plastered and rendered coatings
Roughcast coatings
Beads
Metal mesh lathing
Fibrous plasterwork
Ceramic and quarry tiling
16 Glazing SMM7 Sections L40
Introduction
Estimating for glazing
Types of glass
Sealed multiple glazed units
Roof and wall glazing
17 Decorative papers and painting SMM7 Sections M52, M60
Painting and clear finishing
Decorative papers
18 Drainage SMM7 Sections R12, R13
Excavating drainage trenches
Hand excavation of pipe trenches
Machine excavation of pipe trenches
Pipework: vitrified clay and uPVC
Beds and surrounds
19 Electrical work SMM7 Sections V, P31
Introduction
Primary switchgear
Cabling
Builder’s work
20 Analogous rates
Introduction
Elements of analogous rates
Procedure
Interpretation of bills and schedules
21 Information technology
Introduction
Background
Text/graphics
Project management
Data analysis
Drawings/CAD
Communications
Networks
22 Tender strategy
Introduction
The company plan
Tender policy
Construction of a cash flow diagram
Risk and uncertainty
Appendix A Cost of mortars, renders and fine aggregate screeds
Introduction
Data for mortar costing
Manual costing
Spreadsheet costing
Index
People also search for Estimating for Builders and Surveyors 2nd Edition:
can a builder appoint a building surveyor
estimating for builders and surveyors pdf
estimating building materials
construction estimating formulas pdf
Tags:
Ross Buchan,Eric Fleming,Fiona Grant,Estimating,Builders,Surveyors